Think.
Commercial buildings require a lot of thought to improve efficiences. Let our decades of experience guide you.
Design.
Our in-house design team will sit down with you to create buildings that serve your needs and fall within your budget.
Build.
After we learn your goals and design the project based on them, we’ll handle the entire construction process.
Save.
The design-build process can save time and money. Speak with our experts today and find out just how much.
Beacon Marshall Companies: Our Start and Our Philosophy
President Charles Marshall on how the company got its start
So, just how did the Beacon Marshall family of companies, which is an award-winning design-build firm based in Northeast Ohio, get its start? President Charles Marshall discusses the company’s humble beginnings in this short video.
Beacon Marshall's Total Concept Approach to Design-Build
There are many benefits to the Design-Build process. In this short video, learn some of the benefits, along with Beacon Marshall’s approach to the process, which we call the Total Concept Approach.
We Build Environments and Relationships
Distribution
A distribution center must be designed properly for the specific use. Different products require different processes. We can help you through this process.
Industrial
We know industrial processes We can bring a set of fresh eyes to your project to help see if you processes are efficient and what might be creating inefficiences.
Manufacturing
A manufacturing plant is more than just “building a box.” Let us analyze your efforts to see if you have the best work flow from raw materials to a finished product.
Warehouses
Warehousing is about maximizing the space you have. Let us evaluate the racks, ventilation, height and open areas contribute to a successful operation.
How our process saves you time and money.
Time saved
Money saved
“One thing stands out in my mind. We were quoted a square foot figure which North Gateway tire agreed to. When the construction was finished, the final figure came in considerably lower then we were quoted and the quality of the work was second to none.”
Darrel Hill, President, North Gateway Tire Company
Case Studies
Have a Problem?
We Provide Solutions.
Not all solutions will be so drastic, but when one client discovered it had a problem with its site and a scheduled steel delivery could not happen in three weeks, Beacon Marshall Companies found a solution. We’ve been in construction for decades and can help navigate your project through any issues.
Contact us for more information, or to schedule a tour call 330-659-2040.
This parcel is the largest still available at 7.22 acres. The parcel is perfect for any industrial/ distribution/warehouse facility. Located in the northern, center of the business park, the lot is spacious and well treed. It is perfect for a number of building types – but probably best suited for a large distribution or warehousing operation. We have previously designed a potential building for the site and are glad to share it with you.
By the Way…
Lots 2R and 14-C1 have enough fill on site for the building pad. Both lots have a detention basin sized and built for the storm water run-off. (Quite a savings in the development cost…)
Location: Beacon West, LOT 2R
Acres: 7.22 acres
Cost Per Acre: $83,103/Acre
Total Land Cost: $600,000
Contact us for more information, or to schedule a tour call 330-659-2040.
Lot 14 – C1 is 6.596 acres with a price of $580,000 or $87,933 per acre
This parcel is the second largest still available at 6.596 acres. Perfect for any industrial/ distribution or warehouse facility, the parcel is located in the northern, center of the business park, and fronting Clemens Road. The parcel is spacious and well treed. It is the perfect site for any number of building types – but probably best suited for a large distribution or warehouse operation. We have previously designed a potential building for the site and are glad to share it with you.
By the Way…
Lots 2R and 14-C1 have enough fill on site for the building pad. Both lots have a detention basin sized and built for the storm water run-off. (Quite a savings in the development cost…)
Location: Beacon West, LOT 14-C1
Acres: 6.596 acres
Cost Per Acre: $87,933
Total Land Cost: $580,000
Latest News from Beacon Marshall
Beacon Marshall receives Heritage Ohio Award for Farmers Exchange Project
Heritage Ohio, the state’s official preservation and Main Street organization, awarded Beacon Marshall Cos. the Best Commercial Building Rehabilitation Award for 2020. Beacon Marshall renovated
The Medina Farmers Exchange Videos by Armstrong
The renovation project at the formerly condemned Medina Farmers Exchange facility at 320 S. Court St. has been a labor of love for Charles Marshall, president of Beacon Marshall Cos.